Subscribe to PLMJ’s newsletters to receive the most up-to-date legal insights and our invitations to exclusive events.
We are looking for people who aim to go further and face the future with confidence.
Subscribe to PLMJ’s newsletters to receive the most up-to-date legal insights and our invitations to exclusive events.
We are looking for people who aim to go further and face the future with confidence.
Learn more about BEREC’s proposal for changes to rules on high-capacity network.
BEREC[1] has approved a proposal to amend the guidelines on the requirements that electronic communications networks must meet to be classified as very high capacity networks (VHCN[2]), in particular with regard to downlink and uplink bandwidth, resilience, latency and variations. This document was open for public consultation until 30 April, and the final version is expected to be published by 31 December 2025.
Article 82 of the European Electronic Communications Code (EECC) gives BEREC responsibility for developing guidelines on the criteria for classifying a network as having very high capacity. In this context, BEREC intends to (i) update these criteria in the light of the development and maturity of new technologies and (ii) provide practical information on the capacity of communications networks and operators in accordance with Article 4(1)(j)(i) of the BEREC Regulation[3].
The new version of the guidelines focuses on the following issues:
Four years after the first version of the guidelines, and following surveys on the state of the art of VHCN technology and performance in Member States[4], BEREC considers that the guidelines should be updated.
According to the guidelines, networks that can be considered as VHCNs must meet the following performance thresholds:
The analysis, based on data collected in 2024, confirms technological stability in the fixed segment, with no relevant developments identified with respect to the most advanced access technologies already considered in 2020, namely G.fast (212 MHz) and DOCSIS 3.1. On the basis of this empirical evidence, BEREC concluded that the performance thresholds defined at that time should be maintained as they were still considered appropriate for the current state of the art.
The proposed update of the BEREC Guidelines includes a review of the technical criteria applicable to mobile networks for the purpose of qualification as Very High Capacity Networks under Article 82 of the EECC[5]. The aim of this review is to ensure that mobile networks, in particular those based on 5G technology, can be considered technically equivalent to the latest generation of fixed networks, provided that they meet objective performance thresholds under normal peak conditions.
BEREC’s analysis is based on data collected from mobile network operators in 19 Member States between May and June 2022. The methodology used distinguishes between two scenarios[6]:
BEREC notes that the data collection focused mainly on Scenario 1[7] , given the early stage of 5G technology deployment in many markets at the time of data collection. This methodological limitation required a cautious review based on empirical evidence representative of the current state of mobile infrastructure in the EU.
A comparison between the thresholds defined in the original version of the Guidelines (2020) and those now proposed shows the following adjustments:
It follows from the above that BEREC is proposing a cautious update that reflects developments in mobile network performance, in particular in terms of bandwidth, latency and availability indicators. The retention of some parameters (uplink) and the adjustment of others (packet loss) reflect a compromise between technical requirements and regulatory reality.
The proposed update of the BEREC Guidelines has important implications for national regulatory authorities (NRAs), which are responsible under the EECC for applying the technical criteria in the context of the markets they supervise.
Although limited in scope, the new version of the Guidelines raises a number of issues that deserve particular attention in the public consultation, of which we highlight the following:
The consideration of these aspects in the final version of the Guidelines could help to strengthen the legal certainty, regulatory consistency and technical feasibility of the Guidelines themselves, and ensure a consistent and effective application of the criteria for qualifying VHCNs in the European area.
[1] Body of European Regulators for Electronic Communications.
[2] Very High Capacity Networks.
[3] Regulation (EU) 2018/1971 of the European Parliament and of the Council of 11 December 2018 establishing the Body of European Regulators for Electronic Communications (BEREC) and the Agency for Support for BEREC (BEREC Office).
[4] In the first quarter of 2024, BEREC, with the support of Member States' national regulatory authorities, collected technical data from fixed network operators, including fibre-to-the-building (FTTB) networks terminated with copper pairs and hybrid fibre-coax (HFC) networks with fibre to the premises. The purpose of this data collection process was to assess the actual performance of the most advanced technologies currently in use and to verify the relevance of the thresholds set out in the 2020 Guidelines.
[5] The EECC, in Article 2(2), defines a very high capacity network as a specific type of electronic communications network and not just as a segment of a network. In this respect, in order to assess the performance of equivalent networks, it is necessary to consider the network architecture up to the point of termination at the end-user.
[6] The metrics considered to define these scenarios were: (i) normal peak conditions; (i) the service with the highest data rate (downlink+uplink) currently available on the network; (iii) other services available with the same quality of service (QoS) to the end-user; (iv) end-user QoS limitations caused by CPE/ME34 not taken into account.
[7] See points 112 and 119.
[8] According to Article 4(1)(2)(a) of Decision (EU) 2022/2481 of the European Parliament and of the Council of 14 December 2022 establishing the Digital Decade Policy Programme for 2030, by 2030 “all end users at a fixed location are covered by a gigabit network up to the network termination point, and all populated areas are covered by next-generation wireless high-speed networks with performance at least equivalent to that of 5G, in accordance with the principle of technological neutrality”. According to recitals 13 and 14 of Decision (EU) 2022/2481, this objective aims at ensuring digital connectivity with the best performance, resilience, security and sustainability for everyone and everywhere in the Union, including in rural and remote areas. To this end, the Digital Decade 2030 programme states that all transport technologies and systems capable of contributing to the achievement of gigabit connectivity, including current and future advances in fibre, satellite, 5G or other future ecosystems and next generation Wi-Fi, should be treated equally where they offer equivalent network performance. In this respect, the alignment of the BEREC Guidelines with this strategic framework helps to ensure regulatory consistency and stability in the pursuit of these objectives.